Finishes & interiors

Painting, tiling, parquet and interior doors; the part you see, done with craftsmanship and materials chosen together.

Finishes are what you look at every day: a crooked joint, badly applied paint or poorly laid parquet show immediately. That is why we work with a few trusted layers and painters, chosen over the years and supervised directly on site.

The quote always includes the "substrate preparation" line: sanding, skim-coating, primer. It is the invisible part that makes the difference between a finish that lasts ten years and one that spoils after six months.

Our services

Painting & decorating

Interior and exterior painting, decorative plasters, glazed finishes and anti-mould treatments. Sanding, masking and end-of-site cleaning included.

Typical time: 2–5 days

Tiling & porcelain

Laying of wall and floor coverings in porcelain stoneware, ceramic and marble. Bathrooms, kitchens, terraces and entrances (including large formats, diagonal or herringbone laying).

Typical time: 3–7 days

Parquet

Laying of pre-finished and solid parquet (oak, ash, walnut). Sanding and varnishing of existing parquet, spot repairs, oiled or glossy finishes.

Typical time: 3–6 days

Interior doors

Hinged and sliding interior doors (including pocket doors), hardware replacement, fitting of thresholds and frames. Coordination with our trusted carpenter.

Typical time: 1–3 days

Frequently asked questions

How many coats of paint does a proper job need?
The standard is one coat of primer and two coats of breathable paint. On badly damaged walls a preliminary skim-coat may be needed. We always state what we will do and how many coats we will apply before starting.
Can I choose the tiles and parquet myself?
Of course. We can take you to the suppliers we work with regularly for competitive prices, or lay material you have bought yourself. Either way we check quality and quantity before delivery.
How long before I can walk on freshly laid parquet?
For glued pre-finished parquet, 24–48 hours; for floating ones you can walk on it right away. For site-varnished parquet, full drying takes 5–7 days, during which the room must be left clear.
Can a bathroom be redone without demolishing everything?
In some cases yes; laying new tiles over the old ones (if the structure allows), replacing fixtures and the shower enclosure without altering the drains. It is a faster, cheaper route, but it must be assessed on site.
Will you help me choose colours and finishes?
Yes, it is part of the site visit. We bring the main manufacturers' swatches and think through colour and material choices with you, considering the light and style of the home. If extra support is needed, we rely on a trusted interior designer.

Let's start with a free site visit

Message us on WhatsApp and we'll set up an appointment. We come and see the job in person.

The more details you share in the chat, the more accurate the quote will be.